AI for Construction Documents

Ready for
TakeOff

Analyze construction drawings into clear insights and reports in seconds.

A-40-1-0013 · Floor Plan 03, Level 2 · 1:50
Analysis complete
20.66 m 12.01 m 5.52 m 8.14 m 5.52 m 5.94 m 5.02 m R1 · 32.8 m² R2 · 27.7 m² R3 · 90.4 m² R4 · 32.8 m² R5 · 27.7 m²
Wall type
Flooring
Windows
Est. cost
Analyzing
Reading drawing set
Extracting quantities
Detecting materials
Estimating costs
Summary
0
Total m²
0
Rooms
Windows
Ext. walls
Layers
Room zones
Dimensions
Windows / doors
Hover over a room to see materials, dimensions and cost estimates.

Ask the data

Ask questions in natural language about drawings, quantities, cost estimates, revisions, and sustainability.

How many meeting rooms are in the project?
Which materials have the highest CO₂ impact?
What is the cost of the latest revision?
Hi. I’m Qvintos AI assistant. I search across all extracted project documents. 10:20
What is the financial impact of the latest revision? 10:20
Ask a question about the project...
AI Assistant

Build with
confidence

Qvintos doesn't just extract data — it makes your entire project documentation conversational. Ask questions, get answers, and make decisions backed by the actual drawings and specifications.

Search across every document
Ask about any drawing, revision, or specification in your project — Qvintos finds the answer instantly.
Traceable to the source
Every answer references the exact drawing or document it came from — no black-box outputs, no guesswork.
Instant — no waiting
What used to take hours of manual document review now takes seconds. Ask in plain language, get structured answers.
AI Overlay

See what the AI reads
in your drawings

Drag to reveal how Qvintos layers intelligence over your 2D floor plan — identifying rooms, extracting dimensions, and generating takeoffs automatically.

Plan 03 — Floor 2
Scale 1:50 · 312 objects detected
Original
AI-overlay
Split view
JORDKABELGATAN 4 · ÄLVSJÖSTADEN FLERBOSTADSHUS · NYRENS ARKITEKTKONTO PLAN 03 1:50 · FLOOR 2 307 MÖTESRUM 308 MÖTESRUM 301 TRAPPHALL 302 HISS A B C D 20 660 12 010 N
AUGUSTENDAL 8VÄGEN 45 · NACKA STRAND PLAN 03 1:50 · VÅN 2 20.66 m 5.52 m 12.01 m A B C D 307 Meeting Room N 32.8 m² Open Office Central workspace 90.4 m² 308 Meeting Room S 27.7 m² 301 Stairwell 32.8 m² 309–314 WC 27.7 m²
Original
✦ AI-overlay
← drag to reveal →
TakeOff Specification
97% confidence · Floor Plan
Building Dimensions
Outer width20.66 m
Outer depth12.01 m
Wall thickness ext.0.46 m
Perimeter65.34 m
Elevation+12.62 m
Exterior Walls
Top (North)20.66 m
Bottom (South)20.66 m
Left (West)12.01 m
Right (East)12.01 m
Internal Walls
IV1 main partition11.11 × 0.31 m
IV2 main partition10.27 × 0.27 m
IH1 horizontal5.52 × 0.31 m
IH2 horizontal5.52 × 0.31 m
Rooms / Zones
307 Meeting Room N
2 windows · Parquet
32.8 m²
Open Office
4 windows · Timber
90.4 m²
308 Meeting Room S
2 windows · Ceramic
27.7 m²
301 Stairwell / 302 Lift
2 windows · Ceramic
32.8 m²
309–314 Lobby / WC
2 windows · Tiles 30×30
27.7 m²
AI for Construction Documents

Data to
insight

Qvintos processes your entire project documentation in minutes — turning hundreds of unstructured files into structured, queryable intelligence.

Qvintos — Project Intelligence app.qvintos.com/projects/brf-skytten
BRF Skytten
Jordkabelgatan 4, Älvsjö
Active
Overview
Drawings 8
Extraction
Quantities 1280
Revisions 3
Schedule
Calculator
Export
MJ
AI Processing Complete

Extracting project data

AI is analyzing drawings, metadata, rooms, quantities, costs and revisions into a unified workflow.

0
Drawings
0
Quantities
Budget
Timeline
Recent Activity
Purchase Orders
Live
AI-verified pricing vs market
INK-2025-001 · Byggmax −15.3k
4 items · Delivery 2025-05-12
Regel 45×95 C24420 lm33.95 kr
OSB 18mm120 m²89.00 kr
✓ Price verified · 8.1% below market
INK-2025-002 · BAUHAUS −11.9k
4 items · Delivery 2025-05-18
Cement Standard 25kg84 sacks82.50 kr
Armeringsnät 5mm48 m²120.00 kr
✓ Price verified · 8.2% below market
Ask the data
Qvintos AI Online
Hi — I've analyzed all 8 drawings. Ask me anything about quantities, costs or revisions.
Extraction Results
8 drawings processed · 1,280 quantity rows generated
Complete
Extraction by category
ItemDrawingQtyUnitUnit costTotalStatus
Revision Tracker
3 revisions detected · Cost impact mapped automatically
⚠ Review required
Quantity Takeoff
Full BOQ · 1,280 line items · Auto-generated from drawings
DescriptionSpecQtyUnitRateAmount
8 Drawings Loaded
Floor plans, sections, facades and details analyzed.
Timeline: 18 months
Gantt chart generated from project data.
Extraction complete
8 drawings analyzed, 1280 quantity rows generated.
Built for modern construction teams

Construction intelligence,
built into every document

Upload drawings, plans, and specifications. Qvintos extracts, structures, and surfaces the data your team needs — automatically.

Takeoff
Automated quantity takeoff
Extract room areas, element counts, wall lengths, and surface quantities directly from architectural drawings — without manual measurement.
Up to 90% faster than manual takeoff
Cost Intelligence
Cost & scope insights
Identify materials, cost drivers, and scope elements from project documentation. Surface gaps and assumptions before they become change orders.
Linked to drawings & specs
Risk
Project risk detection
Detect inconsistencies, missing references, compliance gaps, and coordination conflicts early — across all uploaded drawings and documents.
Checks across disciplines
Security
Secure document processing
All project files are processed with enterprise-grade encryption and access controls. Your drawings never leave your project workspace without authorization.
SOC 2 compliant infrastructure
Collaboration
Project workspace & access control
Manage roles across architects, estimators, contractors, and procurement teams. Control who sees what, at every stage of the project lifecycle.
Role-based permission model
Compliance
Compliance tracking & audit trails
Automatically generate area reports, BBR compliance summaries, and document revision histories. Every change is traceable to its source drawing.
Exports to PDF & Excel
Benchmark

AI precision, measured against the best

We tested Qvintos head-to-head against Bluebeam — the industry standard for manual construction measurement. The results speak for themselves.

99.98 %%
Overall accuracy across all measured elements

Total deviation of just 7 mm across 32.67 metres of measured facade — an error margin of 0.02%. Faster than manual measurement, with no tool, no tape, no rounding.

Measured against Bluebeam as reference
Facade North
North Facade
Qvintos AI
30.448 m
Bluebeam
30.402 m
Accuracy
99.9011%
Deviation
0 mm — 0.01375 m/m²
Facade West
West Facade
Qvintos AI
12.010 m
Bluebeam
12.011 m
Accuracy
99.9917%
Deviation
1 mm — 0.08826 m/m²
Combined Result
Total Measurement
Qvintos AI
32.676 m
Bluebeam
32.663 m
Accuracy
99.9780%
Total deviation
7 mm — 0.02150 m/m²
7mm
Minimum total deviation
Across 32+ metres of measured facade elements, the total AI deviation is just 7 millimetres.
Seconds
vs. hours manually
What Bluebeam requires skilled operators and significant time to measure, Qvintos extracts instantly from the drawing.
Zero
Human input required
No calibration, no trace-editing, no manual tracing. Upload the drawing — Qvintos reads and measures automatically.

Pricing

Choose the plan that fits your project workflows.

Flexible plans for project teams