Model review and coordination
Review models before issue and coordinate between discipline models.
Model review · Multi-model coordination & clashes · Issues / BCF
One workspace over an open register of capabilities. For every request it brings together what the task needs and returns results your professionals can verify.
Three kinds of work the workspace brings in when a request needs them. Never a separate application.
Review models before issue and coordinate between discipline models.
Model review · Multi-model coordination & clashes · Issues / BCF
Design building services in the IFC model you already have, discipline by discipline.
Model preparation · Sprinkler · Ventilation · Plumbing · Heating · Electrical · Fire alarm
Ask the model and the project documents. Every answer shows its source.
Model Q&A · Document intelligence
Every module below has the status Pilot. Pilot means it runs in production, is not yet proven on customer projects and is offered through pilot agreements.
| No. | Module | What it does | Delivers |
|---|---|---|---|
| Model review and coordination | |||
| C-01 | Model review | Clashes (indicative pre-checks), room heights, penetrations, shafts and rule checks, each finding with method and source. | Findings · BCF |
| C-02 | Multi-model coordination & clashes | Indicative clash pre-checks between discipline models, grouped per building element. | Clash groups · BCF |
| C-03 | Issues / BCF | Issues tracked across model versions and exchanged with your coordination tool. | BCF |
| Building services design | |||
| D-01 | Model preparation | Classifies and corrects the model before design, and shows how well it supports each discipline. | Prepared IFC |
| D-02 | Sprinkler | Heads, pipe network, hydraulic calculation and the drawing set. | PDF · DXF · IFC · BCF |
| D-03 | Ventilation | Air terminals, ducts and airflows in the same model. | PDF · DXF · IFC · BCF |
| D-04 | Plumbing | Water supply, waste stacks and circulation. | PDF · DXF · IFC · BCF |
| D-05 | Heating | Room-by-room heat load and radiator placement. | PDF · DXF · IFC · BCF |
| D-06 | Electrical | Outlets, lighting, distribution boards and circuits. | PDF · DXF · IFC · BCF |
| D-07 | Fire alarm | Detectors, zones and loops. | PDF · DXF · IFC · BCF |
| Questions about your project | |||
| A-01 | Model Q&A | Questions about the model, answered with the engine’s results attached as the source. | Answers with sources |
| A-02 | Document intelligence | Questions across the project documents, answered with links to the source documents. | Answers with source links |
Results are proposals, to be reviewed and approved by a qualified engineer.
One conversation reaches all of it. You describe the outcome and never choose a tool.
Clashes and clearances found across disciplines, with a proposal for how to resolve each one.
Every revision compared with the last, and every result reviewed and approved by your professionals.
Quantities per storey, system and component, prepared for estimates and compared across revisions.
Your IFC models understood: storeys, systems, rooms and objects, explored in 3D with the conversation beside it.
Technical reasoning over the model and the documents: what the building is, what it must be, and where it differs.
Answers and technical reports grounded in your documents, every statement with its source.
Heads, pipe networks and hydraulic calculations designed in the model, with the drawings to match.
Ducts, terminals, radiators, supply and waste, sized and routed storey by storey.
Outlets, lighting, boards and circuits, with the single-line diagram from the same model.
Explore concepts and options in the model, and keep every discipline on the same building.
Drawing sets, calculations and technical descriptions produced from the work, ready for review.
Architectural views and renderings generated from the model geometry.
From the first concept to construction, handover and operations, on the same project information.
Specialist agents and Skills do the work; MCP and APIs connect the systems you already use.
And the work that is specific to your organisation, with your own methods and knowledge.
The scope and the terms are set in the agreement with you.